The Heat Challenge

Above 90°F, concrete becomes much harder to work with — accelerated hydration, reduced working time, increased water demand, rapid surface drying leading to cracking.

Start Early

Most summer pours start at 4-5 AM. This allows critical work before peak heat.

Cool the Concrete

Batch plants use chilled water and ice. Goal: concrete temperature below 90°F at placement.

Retarders

Chemical retarders slow setting time. Evaporation retarders form a thin film reducing moisture loss during finishing. Both are standard for Texas summer work.

Immediate Curing

In 100°F+ heat, concrete loses surface moisture in minutes. Curing compound must be applied immediately after finishing. Fog misting can also help.

Planning

Larger crews for faster placement, more trucks scheduled closer together, backup equipment, and contingency plans. Shamrock Concrete's 25 years of Texas experience means quality pours in any conditions.